CASE STUDIES

CORONATION OF TM KING CHARLES III AND QUEEN CAMILLA

Power Logistics delivered a comprehensive and sustainable power solution to both the ceremonial elements and live broadcast from Westminster Abbey of the Coronation of TM King Charles III and Queen Camilla in London.

 

  • Project management
  • Meticulous planning
  • Broadcast power along the processional route, Canada Gate, Green Park
  • Audience welfare, security points, LED screens, control tent
  • Stage V generators sets
  • 26 batteries ranging from 15kWH – 422Kwh deployed
  • Cabling and distribution equipment
  • DDA compliant cable ramp

 

Results

  • 98415 Kg C02e saved by using GreenD+ HVO fuel
  • 2690 Expected hours saved due to use of BESS
  • Largest deployment of batteries at a major event in London

CORONATION CONCERT

Power Logistics provided sustainable show, site and broadcast power solutions for the Coronation Concert held at Windsor Castle in May 2023.

 

  • Project management
  • Site, show and broadcast power
  • Power monitoring and auditing
  • 160kWH batteries to minimise fuel usage
  • 45Kwh batteries were also utilised at the accreditation gates
  • 13km of cable
  • 150 distribution units
  • 400m of DDA compliant cable ramp
  • 2.3km of festoon lighting

 

Results

  • 20,000 litres of fuel saved
  • 832Kwh of battery energy storage deployed

D-DAY 80

Power Logistics delivered a comprehensive and sustainable power solution to the D-Day 80 commemorative events held in both Portsmouth and Normandy.

 

  • Project management
  • Site and show power
  • Power monitoring and auditing
  • Battery energy storage system for the full five weeks the production team were onsite
  • Grid power
  • Green D+ HVO used site wide
  • Solar powered fuel bowsers
  • LED site lighting
  • Dusk to dawn sensors
  • Hydrogen power introduced in 2024

Results

  • 20,000 litres of fuel saved
  • 832Kwh of battery energy storage deployed

PLATINUM JUBILEE CELEBRATIONS

Power Logistics was incredibly proud to deliver site, show and broadcast power to HM The Queen’s Platinum Jubilee Celebrations across the long weekend of 2nd – 5th June 2022.

 

  • Implemented a comprehensive plan for the delivery of a sustainable electrical solution
  • Sustainability was at the forefront of the project
  • On-site at Buckingham Palace for several weeks
  • Battery energy storage systems
  • Site lighting including LED towerlights and 100s of metres of festoon, house nd emergency lighting, along with LED illuminated signage
  • Battery packs for the Jubilee Pagaent
  • Green D+ HVO
  • Grid power
  • DDA compliant cable ramp

 

Results

  • Cost efficiencies
  • CO2 reduction by 90%*
  • Reduced number of generator farms

AWARDS & ACCREDITATIONS

logo logo logo logo logo logo logo logo logo logo logo logo logo