CORONATION OF TM KING CHARLES III AND QUEEN CAMILLA
Power Logistics delivered a comprehensive and sustainable power solution to both the ceremonial elements and live broadcast from Westminster Abbey of the Coronation of TM King Charles III and Queen Camilla in London.
- Project management
- Meticulous planning
- Broadcast power along the processional route, Canada Gate, Green Park
- Audience welfare, security points, LED screens, control tent
- Stage V generators sets
- 26 batteries ranging from 15kWH – 422Kwh deployed
- Cabling and distribution equipment
- DDA compliant cable ramp
Results
- 98415 Kg C02e saved by using GreenD+ HVO fuel
- 2690 Expected hours saved due to use of BESS
- Largest deployment of batteries at a major event in London
CORONATION CONCERT
Power Logistics provided sustainable show, site and broadcast power solutions for the Coronation Concert held at Windsor Castle in May 2023.
- Project management
- Site, show and broadcast power
- Power monitoring and auditing
- 160kWH batteries to minimise fuel usage
- 45Kwh batteries were also utilised at the accreditation gates
- 13km of cable
- 150 distribution units
- 400m of DDA compliant cable ramp
- 2.3km of festoon lighting
Results
- 20,000 litres of fuel saved
- 832Kwh of battery energy storage deployed
G7 SUMMIT
Power Logistics to provide a fully project managed temporary power installation for the G7 summit in June 2021. The event was split across four key sites – Carbis Bay Hotel, Tregenna Castle Hotel Resort, Newquay Airport and the Media Centre in Falmouth. Whilst a multi-tier approach was adopted to utilise the grid wherever possible, given the location of the event, essentially on the Cornwall coast, mains power couldn’t be guaranteed.
- Project management
- Supply and install of generators and batteries
- Cabling, distribution equipment and electrical equipment across the multi-site venues, existing and temporary
- Broadcast power requirements including lighting, technology, computers etc.
- Electrical fittings
- LED Tower Lights
Results
- Number of generators required reduced by using calculated cable runs and utilising existing infrastructure
- 29% reduction in nitrogen Oxide (NOx) emissions
- LED towerlights were set with remote timers to ensure that they were only turned on and off when required
PLATINUM JUBILEE CELEBRATIONS
Power Logistics was incredibly proud to deliver site, show and broadcast power to HM The Queen’s Platinum Jubilee Celebrations across the long weekend of 2nd – 5th June 2022.
- Implemented a comprehensive plan for the delivery of a sustainable electrical solution
- Sustainability was at the forefront of the project
- On-site at Buckingham Palace for several weeks
- Battery energy storage systems
- Site lighting including LED towerlights and 100s of metres of festoon, house nd emergency lighting, along with LED illuminated signage
- Battery packs for the Jubilee Pagaent
- Green D+ HVO
- Grid power
- DDA compliant cable ramp
Results
- Cost efficiencies
- CO2 reduction by 90%*
- Reduced number of generator farms