• Cheltenham Festival

Project Details

  • Construction Date

    2014

  • Location

    Cheltenham

  • Categories:

Project Description

  Over 30 generators
  3,600 meters of 3 phase cable
  17,500 meters of single phase cable
  120 distribution boards

The Cheltenham Festival, held at Cheltenham Racecourse, March 11th – 14th is a highlight in the UK’s horse racing calendar. Power Logistics was delighted to provide the temporary power, in the form of mobile generators, to this prestigious event for the first time in 2014. This was in addition to the supply and installation of all the distribution and cabling that they provided for the festival in 2013 and 2014.

Their experienced team was onsite for a month in the lead up to the event installing more than 30 generators, 3,600 metres of 3 phase cable and 17,500 metres of single phase cable, along with 120 distribution boards to power LED screens, hospitality areas, kitchens, lighting, the paddock, concessions and a number of marquees.

They were also asked to provide the Jockey Club with creative lighting for a marquee in the Owner’s and Trainer’s areas. Lighting products supplied included LED batons, LED par cans and over 40 metres of prolyte truss.